Distribution Centre Site
A large industrial parcel cleared and mass-graded for a warehouse. Extensive fill work across flat ground, a level pad built for the building footprint and the work sequenced around road and utility installation on adjacent parcels.
Workforce Housing Subdivision
Former citrus land cleared for a residential phase. Lots graded, tree lines kept where the layout allowed and the site worked to a developer schedule.
Retail Parcel On The Highway
Ground cleared and graded for a retail centre, an old grove removed and the frontage graded for access and a parking field.
Lot Near Lake Eva
An in-town lot on the streets around Lake Eva. Selective clearing kept the shade trees, grading in a building site and driveway and leaving the older neighbouring homes undisturbed.